MOLT & MOSS NEOCARIDINA DECISION CARD Version: 1.0 Reviewed: 2026-08-12 Topic: Plan water changes and top-offs Situation: You need to replace water, top off evaporation or service the system. Observe first: Name the purpose, measure source and tank water, check temperature and recent trend, and separate evaporation from material accumulation. First action: Prepare replacement water for the actual decision and make a measured change whose volume and chemistry you can record. Record next: Record source, treatment, volume, temperature, GH, KH, conductivity or TDS when relevant, and before and after observations. Stop boundary: Do not use a fixed percentage as a universal rule or use top-off water to claim that accumulated material was removed. Permanent card: https://moltandmoss.com/care/action-cards/water-changes Governing guide: https://moltandmoss.com/care/water-changes This card is a first-decision aid, not a diagnosis, treatment authorization, complete method or substitute for the governing guide.