Plan water changes and top-offs
You need to replace water, top off evaporation or service the system.
Use the whole card. The action stays attached to what must be observed and recorded, plus the nearest inference or action the current guidance cannot support.
Observe first
Name the purpose, measure source and tank water, check temperature and recent trend, and separate evaporation from material accumulation.
First action
Prepare replacement water for the actual decision and make a measured change whose volume and chemistry you can record.
Record next
Record source, treatment, volume, temperature, GH, KH, conductivity or TDS when relevant, and before and after observations.
Stop boundary
Do not use a fixed percentage as a universal rule or use top-off water to claim that accumulated material was removed.
Continue with the governing guide
Plan water changes and top-offs owns the complete method, evidence, limitations and revision history. This card introduces no separate biological claim.
Copy the complete card
Keep every part and both permanent links together.
Open the portable text version or open the complete visual card.
Copy the exact accessibility description
Use this complete description when a platform provides an alt-text field. Do not shorten away the stopping boundary.
Card version 1.0, reviewed 2026-08-12. This is a first-decision aid, not diagnosis, treatment authorization, emergency service or a complete method.